Year |
Operator |
Client |
Project |
Scope |
Hours |
|
2010 |
Gaz de France |
Hertel Defence & Offshore |
L10-AD Power Distribution Module |
Engineering, installation and commissioning assistance of electrical, instrumentation, and Fire & Gas installations. |
2.500 |
|
2009 |
Chevron |
Hertel Defence & Offshore |
Horizon/P9 |
Offshore commissioning co-ordination and supervision. |
850 |
|
2008 |
Talisman |
GustoMSC |
Mopustor Tank installation YME development Norway |
Engineering, delivery, programming, fabrication and commissioning of HIMA F35 system with delivery of sub-sea installed junction boxes and cabling. |
460 |
|
2008 |
Talisman |
GustoMSC |
Mopustor Tank installation YME development Norway |
Site assistance on commissioning and start-up of Mopustor Tank installation. |
220 |
|
2008 |
Gaz de France |
Hertel Defence & Offshore |
E17A offshore Power Module |
Engineering, installation and commissioning, assistance of electrical, instrumentation and Fire & Gas installations. |
2.200 |
|
2005 |
Gaz de France |
Hertel Defence & Offshore |
G16 Power module |
Engineering, installation and commissioning of electrical, instrumentation, HVAC and Fire & Gas installations. |
1.250 |
|
2005 |
Gaz de France |
Hertel Defence & Offshore |
Toolcontainers for G17 and K2BA platforms |
Project management, installation and onshore commissioning. |
800 |
|
2002 |
Heerema Marine Contractors |
Heerema Marine Contractors |
J-lay project “Balder” |
Engineering of the E/I package for the TSM power module. Procurement and installation of all E/I cabling between the TSM and the J-Lay tower and control cabin, and the A&R winch system. Offshore hook-up during trip to Gulf of Mexico. |
10.700 |
|
1997 |
Bluewater |
Hertel Defence & Offshore |
FPSO “Glass Dowr” Control Room Module |
Design, engineering, installation and commissioning of the HVAC control system and the complete electrical & instrumentation installation.(MCC, lighting , fire & gas, P.A, etc.) |
800 |
|
1994 |
Unocal |
Hertel Defence & Offshore |
MCC container for the platform in block Q-1 of the North Sea. |
Design, engineering, installation, testing and inspection. |
200 |
|
1993 |
Unocal |
Hertel Defence & Offshore |
Horizon/P9 |
Procurement, installation, commissioning and hook-up of switchgear and high voltage transformer modules. |
3.100 |